Upload a document, enter your proposed specs, or submit a machine-readable application — and ZoneDSS checks every claim against every applicable planning control. Missing controls, incorrect references, and compliance gaps are flagged instantly.
Whether you're writing a planning report, designing a building, or submitting an application — ZoneDSS checks your work against the actual controls that apply to your site.
Upload a Statement of Environmental Effects, planning report, or DA submission. ZoneDSS reads every claim, checks it against the actual controls for your site, and flags what's missing, what's wrong, and what's incomplete.
Enter your proposed building height, setbacks, floor space ratio, parking spaces, and landscaping — and see pass or fail against every applicable control. Know where you stand before you lodge.
Upload machine-readable development applications in ADAC format. ZoneDSS validates every field against the applicable controls and returns a structured compliance matrix — ready for automated processing.
Every check shows your value, the required value, and a clear pass or fail.
| Control | Your proposal | Required | Result |
|---|---|---|---|
| Building height | 12m | 9.5m max | FAIL |
| Floor space ratio | 1.8:1 | 2.0:1 max | PASS |
| Front setback | 6m | 6m min | PASS |
| Side setback | 1.5m | 1.8m min | FAIL |
| Car parking | 18 | 24 required | FAIL |
| Landscaping | 22% | 20% min | PASS |
We don't ask an AI "does this comply?" We check your proposal against each individual planning requirement one by one. Height limit: pass or fail. Setback: pass or fail. Parking: pass or fail. No ambiguity, no interpretation.
Your proposal isn't just checked against the LEP. We check it against every applicable SEPP, every relevant DCP section, and resolve any overrides between them. If a State policy changes a height limit, we catch it.
When we assess a DA document, we don't summarise it. We check whether it addresses every applicable requirement. If a control is missing from the submission, we flag exactly which one and cite the clause.
Same document, same controls, same assessment — every time. Our compliance checks are deterministic. Two people assessing the same proposal get the same result, unlike AI tools where the output varies with each run.
ZoneDSS compliance assessments are opening to early access users first. Upload your first document and see what you've been missing.
Request Early Access